GENERAL INFORMATION

DATE OF INSPECTION: August 18, 2014

ADDRESS: 13939 Johnson Road, Phelan, CA 92371

OWNER/S: Mark Earl Barlow - Micehele Lee Barlow

TYPE OF STRUCTURE: Single Family, HUD Factory-Built, Fuqoi

HUD ID NO.: Unknown

FHA Loan No.: 048-8023638-703

PARCEL/APN: 3101-48106-0000

TRACT: 910.81

MAP REFERENCE: 4383C3/725-D1

STRUCTURE SIZE: 1440 SqFt

LOT SIZE: 88,426 SqFt

YEAR BUILT: 1987

YEAR INSTALLED: April 29, 1992

BEDROOMS: 3

BATHROOMS: 2

PURCHASE PRICE: $82,000

DATE OF PURCHASE: May 24, 2010

SELLER AGENT: John F. Snyder, Shear Realty- AV





Inspections - HUD 4240.4 1-9.D:

All inspections are performed by HUD-approved fee inspectors assigned by the HUD Field Office (but paid by the lender) or on the HUD-accepted staff of the DE lender (see paragraph 5-2.C.). The fee inspector is to use the architectural exhibits in order to make a determination of compliance or non-compliance. The HUD accepted Plan Reviewer can be allowed to do the fee inspections on the property, because he/she is already familiar with the proposed improvements and can inspect the rehabilitation knowing what was accepted in the work write-up



Cost of Rehabilitation - HUD 4240.4 1-10.B:

Expenses eligible to be included in the cost of rehabilitation are materials, labor, contingency reserve, overhead and construction profit (put in each work item), up to six (6) months of mortgage payments, plus expenses related to the rehabilitation such as permits, fees, inspection fees by a qualified home inspector (i.e., a member of the American Society of Home Inspectors), licenses, inspection fees during construction by a HUD accepted inspector, lien protection fees for title updates and architectural/ engineering fees.

Inspection Fee (During the Rehabilitation Construction Period) -HUD 4240.4 1-13.D:

Established by the local HUD Field Office (see paragraph 5-2.C.), however, Field Offices wanting to set a fee greater than $50 must obtain Headquarters approval. 1) Fees for inspections will be allowed for inclusion in the cost of rehabilitation. If all inspections are not required, remaining funds will be applied to the principal after the final release notice is issued. 2) If additional inspections are required by the lender to ensure satisfactory compliance with exhibits, the borrower or contractor will be responsible for payment; however, the lender has ultimate responsibility.

 

 

OVERVIEW

System Performance Index

A Perspective on the Functionality of the System Components.

Inspected and Certified
Structural
60%
Plumbing
60%
Electrical
60%
Mechanical
60%
Roof Covering
90%
Wall Covering
90%
Floor Covering
90%
Cabinetry
90%
Hardware
90%
Landscaping
90%
Hardscaping
90%
Overall
75%

 

 

 

 

 

 


  • Electrical Amperage (amp) 100
  • Electrical Voltage (volt) 120
  • >Water Pressure (psi) 35
  • Water Heater Capacity (gallon) 50







FHA 203(K) ARCHITECTURAL EXHIBITS















PARCEL MAP





front

© 2016 All Rights Reserved.